
Safety Manager (Data Center Construction)
Job Description
Seeking a Safety Manager to provide Owner Representation on the construction of two data center campuses in Lithia Springs, GA.
Responsibilities
Tasks and Responsibilities:- Look ahead on high-risk activities and assisting with risk analysis of upcoming work.- Produce daily observations and indicator/trend reports on Procure.- Manage, oversee, and audit construction safety. This includes management of multiple New Construction and Renovation projects.- Monitor compliance with site safety programs and requirements, which defines safety requirements that contractors must comply with while working as an Owner's Representative on Data Center projects.- Perform Daily Safety reviews of work in progress in accordance with current Safety Regulations and Standard Operating Procedures (SOP).- Conducts construction site safety audits to identify improper procedures, checks equipment and facilities for hazardous conditions and recommends corrective actions.- Audit and review Methods of Procedures (MOPs) for safety compliance and to minimize site impacts.- Submit Daily, Weekly, and Monthly Safety reports required by the Program.- Monitor compliance to all current OSHA requirements that relate to the specific construction projects.- Report to the Director of Safety, including but not limited to, attending any required meetings or providing safety reports/analysis as requested.- Immediately notify the Director of Safety of any incident or recordable injury on projects.- Monitor Contractor compliance with COVID-19 regulations as defined by county, state, and OSHA. Confirm that Contractor Safety Plans are complete and updated to address COVID Safety Guidelines on each project site.- Confirm that Contractor is reporting all recordable injuries and near-miss incidents within the required timelinesand by filing the proper forms. Review the report for accuracy before filing.- Review and provide comments to the Owner on the project-specific "Project Health, Safety & Environmental Plan" as prepared by the Owner or the Contractor.- Perform ongoing construction site safety inspections and generate safety report for all site visits.- Identify site safety hazards and provide immediate direction to contractor safety representative to eliminate or mitigate them.- Perform reviews and inspections of the jobsite to assure compliance with health and safety regulations and applicable codes.- Participate in site inspections and testing as necessary for required permits, including confined space, hot work, trenching, etc.- Confirm that the New Hire Safety Orientation on-line safety training are available onsite.- Confirm that contractors are performing tailgate safety meetings and training as required by their Contract and/or OSHA requirements.- Attend pre-construction meetings to present Owner's safety program and the role of the field safety representative. Provide comprehensive safety support and guidance for Project Team.- Monitor adherence to zero tolerance and corrective action policy for workers found not in compliance with the Program's safety policy.- Conduct project safety stand-downs with all crews to review the incident for injuries. Educate all site workers on how to prevent a repeat accident.
Job Requirements
Minimum Required Qualifications:- Minimum 5 to 10 years construction/safety experience in critical facilities, mission critical, semiconductor, or similar scope projects primarily for vertical building construction.- Effective communication skills and ability to work with all levels of the project team.- Evidence of completing OSHA 30 Hour Construction Outreach Training within the last three years. In thealternative, evidence of completing the OSHA 500 or OSHA 502 Class may be provided.- Current First Aid and CPR training from a provider recognized by OSHA.- Minimum of holding a valid Certified Safety Professional (CSP) or Construction Health and Safety Technician (CHST) certificate issued by the BCSP Board of Certified Safety Professionals.- Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties andperform time management as required to meet all the position requirements.- Proficiency with Microsoft office and related spreadsheet and database software.- Ability to provide management oversight on behalf of the Owner and effectively complete reporting on a daily basis as required by the program.
Submission Requirements:At a minimum, the candidate's professional resume must include the following:- List of all Educational Achievements- List of all Professional Licenses or Certificates- List of Awards Received- Detailed Employment History with each company including:o Start Date and End Date (Month & Year)o Positions Held


